Problem Solving › Operations

Moving the plant without stopping deliveries

Il trasloco dello stabilimento senza fermare le consegne · Operations · Advanced

The case

You must move production to a new plant 30 km away within 6 months (the current lease is non-renewable). You have 40 machines, 25 workers, and clients with contracts requiring weekly deliveries without interruption and severe penalties. Assembling the lines at the new site takes 6 weeks. How do you plan the move?

Devi trasferire la produzione in un nuovo stabilimento a 30 km entro 6 mesi (il contratto d'affitto attuale non è rinnovabile). Hai 40 macchinari, 25 operai e clienti con contratti che prevedono consegne settimanali senza interruzioni e penali severe. Il montaggio delle linee nel nuovo sito richiede 6 settimane. Come pianifichi il trasferimento?

Read the case, write how you would solve it, in free text, no prompt required, and Grace's AI judges whether your solution actually works, solved or not solved, with a 0-100 score and coaching feedback that points at what is still uncovered without revealing the answer. Your first 5 evaluations each day are free.

Try to solve this case →

Frequently asked questions

What is the "Moving the plant without stopping deliveries" problem-solving case on Grace?

It is an advanced-level Operations case based on a real workplace situation. You read the problem, write how you would solve it in free text, and Grace's AI judges whether your solution actually works, and tells you what is still uncovered.

Who is this case for?

Anyone who wants to train structured problem solving: managers, professionals and candidates preparing for case interviews in Operations. The advanced difficulty makes it a demanding test of real-world judgment.

Can I retry if my solution doesn't solve the case?

Yes. The feedback tells you what remains uncovered, without revealing the solution, so you can strengthen your plan and try again. After you solve it, 6 more Operations cases are waiting.

How much XP is this case worth?

Solving a advanced case earns up to 100 XP on the first successful solution. Failed attempts and repeat solutions earn much less: the reward is for cracking it.

More Operations cases

All 348 problem-solving cases → · Prompt training scenarios →

From our network

Magellano GPS: Fleet Tracking Made Simple

Real-time GPS tracking, remote engine lock, fuel and CO₂ reporting for your fleet.

Visit magellanogps.com →

From the Agora Intelligence blog

More on agora-intelligence.com →

📱 Download the Android app (beta) iOS coming soon

Say what you mean. Get what you need.

Grace Certified, the AI coach that trains and certifies your prompt engineering, by Agora Intelligence.